Pile load tests will be conducted along the north and south banks of the Peace River near the Taylor Bridge this summer, marking the first step towards building a replacement bridge that the North Peace has seen since public engagement concluded in 2022.
Share this post
Solution for Taylor Bridge inches closer to…
Share this post
Pile load tests will be conducted along the north and south banks of the Peace River near the Taylor Bridge this summer, marking the first step towards building a replacement bridge that the North Peace has seen since public engagement concluded in 2022.